Client: KRG
Year: 2013
Duration: 210 days
Work Location: BARZAN – DORE
Scope of Work
The project consisted of two main items:
A-Surveying and designing work for the plan and profile of the road.
B-Execution of all project items. Project activities included:
- Cutting Works in rock areas with Jack-Hammer Work (154,887) m³.
- Sub-base Course and crushed stone .
- Bituminous pavement of two layers (Stabilizer and Binder).
- Retaining wall of (2,568) m².
- Culverts with different dimensions.
- Gutter- Ditch Works(850m.l).