Client: KAR Group
Year: 2018
Duration: 150 days
Work Location: Erbil
This project was about construction of a private road for KAR Group in Erbil-Shawes area.
The road length was 2.1 km and the project included cutting, filling, sub-base and base Course laying and asphalting with stabilizer
and binder layers with all other related work items such as curbstone, road shoulder casting and traffic signs.