SH10 to PF2 flowline construction

Client: Gulf Keystone
Year: 2014
Duration: 90 days
Work Location: SHAIKHAN Block

Scope of Work

11.2 km of flowline including construction of ROW, excavation and back filling ,construction works for installation of four oil and gas flowlines in a common trench from SH10- Well Pad to PF2.

The project scope in general terms includes the following:

  • Construction of 10m right of way (ROW).
  • Digging of trench and lining with soft padding.
  • Backfill.
  • Installing Fiber Optic Cable to run the length of the oil and gas flowlines described above.
  • Constructing all necessary culverts, ditches and trenches to protect against future water damage of the flowlines.
  • Installation of road crossing under main highway by non- cutting technique.