Client: Gulf Keystone
Year: 2014
Duration: 90 days
Work Location: SHAIKHAN Block
Scope of Work
11.2 km of flowline including construction of ROW, excavation and back filling ,construction works for installation of four oil and gas flowlines in a common trench from SH10- Well Pad to PF2.
The project scope in general terms includes the following:
- Construction of 10m right of way (ROW).
- Digging of trench and lining with soft padding.
- Backfill.
- Installing Fiber Optic Cable to run the length of the oil and gas flowlines described above.
- Constructing all necessary culverts, ditches and trenches to protect against future water damage of the flowlines.
- Installation of road crossing under main highway by non- cutting technique.