Client: KRG
Year: 2014
Duration: 360 days
Work Location: Mergasor ( kani bot- bedyal )
Scope of Work
The project was to construct a road on shireen mountain buttress for (7.1) km length which lies in a difficult mountain terrain.
The project included:
- Surveying and designing of the road.
- Cutting through rocky terrain and transporting of material outside project borders using only excavator jack hammer for the amount oh (220,000) m³.
- Two layers crushed stone surfacing.
- Water culvert with different dimensions.
- Bituminous pavement (stabilizer).
- construction of water tank (120) m³ capacity.