Client: KRG
Year: 2015
Duration: 120 days
Work Location: ERBIL
Scope of Work
The project consisted of construction of service road and car parking with area of (8000)m².
- Cutting work.
- Filling work.
- Sub-base Course with two layers Type (A) and (B) granular materials.
- Crushed stone surfacing.
- Asphalt Pavement of Stabilizer and Binder Course.
- Electric poles installation.
- Pedestrian walking shoulder construction.
- Road sign and traffic signals.