Road Construction

Client: KRG
Year: 2014
Duration: 360 days
Work Location: Mergasor ( kani bot- bedyal )

Scope of Work

The project was to construct a road on shireen mountain buttress for (7.1) km length which lies in a difficult mountain terrain.

The project included:

  • Surveying and designing of the road.
  • Cutting through rocky terrain and transporting of material outside project borders using only excavator jack hammer for the amount oh (220,000) m³.
  • Two layers crushed stone surfacing.
  • Water culvert with different dimensions.
  • Bituminous pavement (stabilizer).
  • construction of water tank (120) m³ capacity.