Rectification of M59 Main export line Mechanical defect

Client: Kurdistan Pipeline Company Ltd.
Year: 2022
Duration: 120 Days
Work Location: Duhok – Bardarash

Scope of Work:

EPC Contract consisting of engineering, design,
supply, installation, and construction of the
diversion road at Bardarash road crossing and
exposing the pipeline at the main road to repair
the pipeline and after the reparation of the pipeline
reinstating the main road and diversion road in
accordance with international standards and
engineering best practice.