Client: TAQA
Year: 2019
Duration: 55 days
Work Location: ATRUSH Block
The most important point of all drilling projects is specifying a location as a dump or waste area in order to throw all rubbish or excavated material there. In oil and gas company, for the mentioned purpose a waste pit will be constructed. The project was including but not limited to the following:
•Filling and leveling the specified area using engineering layers
•Cutting, excavating, side slope and anchor trench (will protect the liner from shifting)
•Compaction of the bottom of waste pit and laying 15-20cm silty sand.
•Liner laying, welding and testing
•Construction of a fence around the waste pit