Irrigation system & water tank establishment

Client: KRG
Year: 2013
Duration:75 days
Work Location: BARZAN -DORE

Scope of Work

The project included the construction of two water tanks of (300) m³ each. and supply of 6” Ductile pipe 3.5 KM with excavation, pipe laying, construction of thrust blocks, jointing, installation of valves, provision and installation of water pumps.