Client: private
Year: 2023
Duration: 90 Days
Work Location: Erbil – Barzan – Dore
Design and construction of a concrete water
tank with a capacity of ( 2,500,000) million
liters, The project included all the work items
such as (excavation, concrete, iron, mold,
mechanical room, and waterproofing ).