Client: KRG
Year: 2017
Duration: 90 days
Work Location: BARZAN -DORE
This project included preparation of a 3000 m2 site, leveling, compaction, and construction of two security buildings of 450 m2 area with covered parking lot. It also included the construction of concrete access road and boundary retaining wall covered with decorative stone. In addition to the above work items, the project included casting 250 specially designed New-Jersey barriers.