English Kurdish
+964(0)770 446 2900
HMH STAFF FF H.M.H keestrac



Our Projects - HMH Group » Road Construction

The project was to construct a road on shireen mountain buttress for (7.1) km length which lies in a difficult mountain terrain. The project included: •Surveying and designing of the road. •Cutting through rocky terrain and transporting of material outside project borders using only excavator jack hammer for the amount oh (220,000) m³. •Two layers crushed stone surfacing. •Water culvert with different dimensions. •Bituminous pavement (stabilizer). •construction of water tank (120) m³ capacity.

..

..

..

..

..