Our Projects - HMH Group » flowline construction

11.2 km of flowline including construction of ROW, excavation and backfilling ,construction works for installation of four oil and gas flowlines in a common trench from SH10- Well Pad to PF2. The project scope in general terms includes the following: •Construction of 10m right of way (ROW), •Digging of trench and lining with soft padding, •Backfill, •Installing Fiber Optic Cable to run the length of the oil and gas flowlines described above, •Constructing all necessary culverts, ditches and trenches to protect against future water damage of the flowlines. •Installation of road crossing under main highway by noncutting technique.

..

..